Dammam Housing Project

Client: Tamimi Group
Sub-Contractor: WAPCO/ Madaar International Co.
Contact Person: Mr. Haleem Khan (Project Manager)
Scope of Work: Civil Works includes Excavation, Construction of 150 apartments, Design, Fabrication, Installation of electrical Substation & Road Works.
Duration: 09 Months
Project Value: Approximate 8.4 Million
Status of Project: Completed in Year 2006.




img img

Dahran Mall

Client: M Al-Hokair & Sons Group
Sub-Contractor: WAPCO/ Madaar International Co.
Contact Person: Mr. Sameer (Project Manager)
Scope of Work: Civil Works includes Excavation, Foundation, Backfill, Structure Construction, Roof installation; Interior & Exterior Designing & Electrical works includes layout and termination of electrical cables, HVAC System, air conditioning and Lighting.
Duration: 04 Months
Project Value: Approximate 4.5 Million
Status of Project: Completed in Year 2007.



img img

115/13.8 Kv Al-Masoudi S/S Project, Al-Ahsaa

Owner: Saudi Electricity Company
Main Contractor: Al-Fanar Co.
Sub-Contractor: WAPCO/ Madaar International Co.
Contact Person: Mr. Naeem Akhtar (Project Manager)
Scope of Work: Installation, Fabrication, Erection of Miscellaneous Electrical Equipment, Power Transformers, Switchgear, Relay, Control Panels & Electromechanical System. Cable lying, dressing and termination work. Switchgear, cable tray/ladders system.
Duration: 04 Months
Project Value: Approximate 1.2 Million
Status of Project: Completed in Year 2008.

img img

New Jawatha 230/115KV ,BSP & Reinforcement of Al-Qarn Substation.

Owner: Saudi Electricity Company
Main Contractor: ABB Contracting Co. Ltd.
Sub-Contractor: WAPCO/ Madaar International Co.
Contact Person: Mr. Abdul Qayum Qureshi (Project Manager)
Scope of Work: Reinforcement of Al-Qarn 115/13.8kv S/S. PTS-1032 & Installation Services, Cable Laying, Termination.
Duration: 6 Months
Project Value: Approximate 3.5 Million
Status of Project: Completed in Year 2008.

img img

Civil Works & Telecom Installation-BTS Upgrade

Owner: Mobily Telecom.
Main Contractor: Alcatel-Lucent
Sub-Contractor: Madaar International Co.
Contact Person: Mr. Muhammed Al-Enizy (Procurement & Sourcing Manager)
Scope of Work: Trenching, Installation of DC Power cable to BTS Cabinets, Shifting of Existing BTS Cabinets.
Duration: 6 Months
Project Value: Approximate 0.9 Million
Status of Project: Completed in Year 2009.

img img

Saudi NCP South Plot Project- Pkg. B, Jubail

Owner: Saudi Polymer Company.
Main Contractor: National Contracting Co. (NCC).
Sub-Contractor: Madaar International Co.
Contact Person: Mr. Bijay Shukla (Project Manager)
Scope of Work: Surface Preparation for site and Laydown areas and supply of temporary facilities.
Duration: 02 Months
Project Value: Approximate 1.2 Million
Status of Project: Completed in Year 2009.

Read More
img img

Housing Project Project- Pkg. B, Al-Khobar/Azizia

Owner: ARAMCO
Main Contractor: Yamama Company
Sub-Contractor: Madaar International Co.
Contact Person: Mr. Khalid Abdullah (Project Manager)
Scope of Work: Surface Preparation for site and Lay down areas and supply of temporary facilities.
Duration: 02 Months
Project Value: Approximate 1.2 Million
Status of Project: Completed in Year 2013.

img img

Construction of GCCIA Warehouse at FadhiliSubstaion, Jubail

Owner: Gulf Cooperation Council Interconnection Authorities (GCCIA)
Main Contractor: Madaar International Co.
Contact Person: Mr. Bouchti M’bark (Project Manager)
Scope of Work: Site Preparation, Laying, Grading, Compaction of Sub Base, Base Course, Paving of Asphalt for stockyard & Construction of Warehouses.
Duration: 05 Months
Project Value: Approximate 3.0 Million
Status: Completed in Year 2013.

img img

Construction of EDAFA Executive Tower, Olaya, Riyadh

Main Contractor: Shapoorji Pallonji Engineering & Construction
Sub-Contractor: Madaar International Co.
Contact Person: Mr. Alan Johnston (Senior Project Manager)
Scope of Work: EMP and finishing work in the tower.
Duration: 06 Months
Project Value: Approximate 5.0 Million
Status: Completed in Year 2013.


Read More
img img

Saudi Aramco Total Refining and Petrochemical Project SATORP

Owner: Saudi Aramco
Main Contractor: Power System Contracting Est.
Sub-Contractor: Madaar International Co.
Contact Person: Mr. Kaleem (Operation Manager)
Scope of Work: Disconnection & Removal of temporary power & earthing cables from server & station cabinet and OTS consoles. Disconnection & Removal of temporary Cat-6 FTB cables from server & station cabinets and OTS consoles. Removal of temporary UPS system. Removal of wall mounting switch cabinets with switch from TTF. Removal of server & station cabinets from TTF size 2400 w x 1000 d x 2200 h mm. Removal of OTS Evan consoles printer & from TTF. Installation of server station cabinets and OTS consoles. Installation of wall mounted switch cabinets with switch to GSB. Supplying, laying and termination of 3 core x 6 mm² LSZH unarmed power cables from UPS A&B PDB, in consoles and, 1 core x 25 mm² earthing cables.
Duration: 03 Months
Project Value: Approximate 0.7 Million
Status of Project: Completed in Year 2013.

Read More
img img

Ras-Alkhair SEPCO- Project Site, RasAlkhair

Owner: SABIC
Main Contractor: National Contracting Company.
Sub-Contractor: Madaar International Co.
Contact Person: Mr. Abraham Mathews (Financial Manager)
Scope of Work: Construction of concrete trenches, Sand Filling, Cable Laying, Covering and Backfilling.
Duration: 03 Months
Project Value: Approximate 01 Million
Status of Project: Completed in Year 2013.












img img

SABIC Sharq Plant, Jubail

Owner: SABIC
Main Contractor: Dar Petro Operation & Maintenance Co.
Sub-Contractor: Madaar International Co.
Contact Person: Mr. Shahid Mirza (Operation Manager)
Scope of Work: O&M for Switch Gear (mechanical inspection & testing, electrical testing & inspection), Bus Duct (inspection & maintenance), Motor Control Center (inspection & maintenance), Distribution Panel Board (inspection & maintenance), UPS (inspection & maintenance), Power Supply (inspection & maintenance, move, disconnect electrical connection & inspection), Boiler Feed Water Pump (inspection & maintenance) and Battery Charger (inspection & maintenance).
Duration: 02 Months
Project Value: Approximate 1.3 Million
Status of Project: Completed in Year 2014.